May 19, 2014 At 03:33 PM By James B
James BMonroe, LA
I was just fitted into a set of LH 714 AP2 irons (very excited). Standard L/L/L and Project x 6.0 shafts. Once the order is recieved from the local retailer how long will it take form them to be shipped from the factory?
Thanks,
James
Cath D.Carlsbad, CA
Hi James, Once the order is inputted into our system, it should leave in about 3 days. All components are in stock!
It is a 3-4 day transit
Marc WNewark, DE
May 21, 2014 At 01:15 PM
Could I expect roughly the same time frame to DE for 714 MB's 2* flat and 1* strong with KBS Tour V X shafts?
The Tour V shafts are currently not kept in house, so we have to place the order with KBS for the shafts. We quote 2-4 weeks depending on delivery of the shafts. In the future, we anticipate the V shafts being a standard offering and the time frame will be about 3 days to build.
Brian WPlattsburgh, NY
Hi Cathi,
How about the ap2's with the FST KBS tour? Should be being ordered today or tomorrow. What is the the lead time on those?
thanks as always!
June 02, 2014 At 08:30 PM
Hi Cathi, How about the ap2's with the FST KBS tour? Should be being ordered today or tomorrow. What is the the lead time on those? thanks as always!
kyle gwhitby, ON
Hey Cathi,
I ordered a set of 716 MB/CB with KBS-C Taper shafts, as well as a 915 D2 with the Adilia Phenom Rip shaft from my school. I ordered it in mid november and was wondering when they would get here
Chris T., Club ConciergeCarlsbad
Hi Kyle,
Please have your college coach give us a call, and we will be happy to provide you with an update.
June 02, 2014 At 05:51 PM
Karl LWest Point, TX
Sign In
Haven't registered for Team Titleist yet?
Sign Up