Shipping time frame

Follow Thread

By James B

  • 0 Likes
  • 11 Replies
  1. James B

    James B
    Monroe, LA

    I was just fitted into a set of LH 714 AP2 irons (very excited). Standard L/L/L and Project x 6.0 shafts. Once the order is recieved from the local retailer how long will it take form them to be shipped from the factory?

     

    Thanks,

    James

  2. Cath D.

    Cath D.
    Carlsbad, CA

    Hi James,  Once the order is inputted into our system, it should leave in about 3 days.  All components are in stock!

  3. James B

    James B
    Monroe, LA

    Great, I believe the order was placed on Monday. Hopefully they will get out in the mail sometime this week. What is the transit time from California to Louisiana?
  4. Cath D.

    Cath D.
    Carlsbad, CA

    It is a 3-4 day transit

  5. Marc W

    Marc W
    Newark, DE

    Cathi, Titleist Club Concierge said:

    It is a 3-4 day transit

     

    Could I expect roughly the same time frame to DE for 714 MB's 2* flat and 1* strong with KBS Tour V X shafts?

  6. Cath D.

    Cath D.
    Carlsbad, CA

    The Tour V shafts are currently not kept in house, so we have to place the order with KBS for the shafts.  We quote 2-4 weeks depending on delivery of the shafts.  In the future, we anticipate the V shafts being a standard offering and the time frame will be about 3 days to build. 

  7. Brian W

    Brian W
    Plattsburgh, NY

    Hi Cathi,

    How about the ap2's with the FST KBS tour? Should be being ordered today or tomorrow.  What is the the lead time on those?

    thanks as always!

  8. Cath D.

    Cath D.
    Carlsbad, CA

    Brian W said:

    Hi Cathi,

    How about the ap2's with the FST KBS tour? Should be being ordered today or tomorrow.  What is the the lead time on those?

    thanks as always!

     
    Hi Brian,  It should ship in 3 days once we have received the order.
  9. kyle g

    kyle g
    whitby, ON

    Hey Cathi,

    I ordered a set of 716 MB/CB with KBS-C Taper shafts, as well as a 915 D2 with the Adilia Phenom Rip shaft from my school. I ordered it in mid november and was wondering when they would get here

  10. Hi Kyle,

    Please have your college coach give us a call, and we will be happy to provide you with an update.

  11. Marc W

    Marc W
    Newark, DE

    Cathi, Titleist Club Concierge said:

    The Tour V shafts are currently not kept in house, so we have to place the order with KBS for the shafts.  We quote 2-4 weeks depending on delivery of the shafts.  In the future, we anticipate the V shafts being a standard offering and the time frame will be about 3 days to build. 

    Thanks for the reply. Looks like my PX shafted 710's will be in a little longer than I had anticipated.
  12. Karl L

    Karl L
    West Point, TX

    Wondering what the approximate turnaround time is on a set of 716 AP1, standard loft and lie, KBS tour 90 S shaft, standard and stock Titleist grips. Fitted and ordered from GS in San Antonio

Please login to post a comment.

Sign In

Haven't registered for Team Titleist yet?

Sign Up